Applied pipeline Services
  • Home
  • Projects
  • evants
  • More
    • Home
    • Projects
    • evants
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

Applied pipeline Services

Signed in as:

filler@godaddy.com

  • Home
  • Projects
  • evants

Account


  • Bookings
  • My Account
  • Sign out


  • Sign In
  • Bookings
  • My Account

APPLIED PIPELINE SERVICES PROJECTS

UNITED ARAB EMIRATES

Explore our projects across the UAE, where Applied Pipeline Services (APS) delivers expert construction, maintenance, and inspection solutions for the oil, gas, and utilities sectors.

Majid Al Futtaim

  

2.5 Km Sewer and Rainwater network rehabilitation in Tilal al ghaf community wising Mechanical liners.

Khansaheb Civil Engineering

  

25 Lm Sewer pipe 6” UPVC network at University of Birmingham Dubai – Academic City, pipe unblocking from concrete under foundation and rehabilitation with CIPP pipe lining.

Sharjah Public Works

  

Leak detection and CCTV inspection for DN100 PVC for Drainpipe of School pool pipes.

EMAAR

  

Pipe rehabilitation using high pressure CIPP to rectify DN550 UPVC for Return pipe of Burj Khalifah Main entrance fountain.

AL DAR

  

Pipe rehabilitation using high pressure CIPP to rectify DN600 UPVC for Return pipe of Yas Mall Main entrance fountain.

JUMEIRAH Group

Pipe rehabilitation using high pressure SIPP (PU lining) to rectify DN200 HDPE pipe for main water supply of Burj Al Arab and wild wadi in Dubai.

Mohammed Abdulmohsin Al-Kharafi & Sons

  

Pipe Inspection & rehabilitation using high pressure CIPP to rectify DN2400 GRP pipe for storm water pipe under Dubai international airport runway.

Villa - Saadiyat

Rain gutter 9 pipe CCTV inspect

Burj khalifa

Fountain Return Pipe DN500 Lining

Atlantis, The Palm

Atlantis Dm Tank pvc inlet pipeing and pipe inspection

Al Raha Beach Hotel

MAIN POOL, Villa Pool & KIDS POOL FULL PIPE INSPECTION AND REPAIR

Hotel & Chalets Of Al Raha Beach

Leak Detection_Fire Hydrant Line & Pool Pipe inspection ARBH

Atlantis, The Palm

DN35 inlet pipes at Dolphin lagoon one

SPOT ELECTROMECHANICAL CONT

CIPP Pipe Lining 600mm

Arabian Coast Contracting L.L.C

Sewage & Drain Pipe rectification

Hotel & Chalets Of Al Raha Beach

Pool Pipes Rectification

Madinat Jumeirah LLC

CCTV PIPE INSPECTION_DEWA WATER LINE _MINA A SALAM JUMEIRAH

Ejadah Asset Management Group L.L.C

AL KHAIR SCHOOL POOL PIPELINING_AL AIN

Nshama Development LLC

NSHAMA_HAYAT PARK 2 KIDS POOL DRAIN PIPE LINING

Atlantis, The Palm

Pipe rectification Entrance Fountain supply pipe

Aden Tech. Cont.

Cipp lining _AL THIQAH HEALTH CLUB POOL

Qasr Al Sarab Hotel-Sole Proprietorship L.L.C

Domestic & Chilled water pipeline leak detection

Burj Khalifa L.L.C

rehabilitate the 63mm Inlets Lower Basin Supply Line using an advanced trenchless method, combining CIPP and epoxy pipe lining for maximum durability.


Kingdom OF SAUDI ARABIA

Explore our projects across KSA, where Applied Pipeline Services (APS) provides expert construction, maintenance, and inspection solutions for the oil, gas, and utilities sectors.

BACS

  

Pipe Inspection & rehabilitation using high pressure CIPP to rectify DN600 GRP pipe for storm water pipe under Riyadh Metro rain at the At Takhassussi station.

NAFFCO

  

Pipe Inspection & rehabilitation using pipe leak correlators and signal detection for pipe leak detection and high pressure Slip Lining to rectify DN200 GI pipe for Fire hydrant pipe at al Diriyah area – Riyadh .

ARAMCO

  

Pipe Inspection & rehabilitation using high pressure CIPP to rectify DN100 & DN200 UPVC pipe for storm water pipe under foundation at King Salman Global Maritime Industries Complex at Ras al Khair – Saudi Arabia.

ENOVA

  

Pipe Inspection & rehabilitation using high pressure CIPP to rectify DN65 & DN100 UPVC pipe for Drainpipe under foundation at Riyadh – Saudi Arabia.

NWC

NWC - Sewage pipe cleaning and CCTV inspection pipes from 150 mm to 1800 mm in al olla area 6.8 KM

B_fit

The inlet pipe DN65 to the main pool was blocked with injection Foam applied team cleaned the pipe and rectified the damaged pipe without excavation and with no interruption of time

Optimo

The inlet pipe DN65 to the main pool was blocked with injection Foam applied team cleaned the pipe and rectified the damaged pipe without excavation and with no interruption of time

King Salman Park, Riyadh

successfully completed a leak detection project at King Salman Park for Nesmapartners, covering 600m of 700mm GRP pipe.

SEPCO Electric Power Construction Corporation

completed a successful project for Saudi Aramco at the King Salman Global Maritime Industries Complex in Ras Al Khair. Using high-pressure CIPP technology, we rehabilitated DN100 & DN200 UPVC stormwater pipes under the foundation

Nesma & Partners - Masar Makkah Project

Pipe Inspection & rehabilitation using high pressure CIPP at makkah – Saudi Arabia.

King Salman International Complex for Maritime Industries and Services

Applied Piping Services has successfully completed the inspection and rehabilitation of pipes of various sizes using the CIPP (Cured In-Situ Pipe) technology at the King Salman International Complex for Maritime Industries and Services, in partnership with Aramco and SEPCO.

Add a footnote if this applies to your business

Copyright © 2025 Applied pipeline Services - All Rights Reserved.

  • Projects
  • evants

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept